Page Title




   Department of Transportation Building

Floor cracks sealed and air balanced the HVAC system to reduce radon levels.

  • Project Type: HVAC Corrections and Installation
  • Location: Spokane, WA
  • Specifications & Challenges:
    • 24" concrete buried cold air return
    • Existing cold air return abandoned and used as sump
    • Cold air return moved above grade
  • Radon Level (Pre-Project): 6 - 45
  • Radon Level (Post-Project): 0.3 - 0.7
DoT Building

   WA State Employee Credit Union
WA State Employee Credit Union

  • Project Type: HVAC Corrections & Installation
  • Location: Spokane, WA
  • Specifications & Challenges:
    • 4,000 sqft of slab area
    • 1 story
  • Radon Level (Pre-Project): 4.8 - 28
  • Radon Level (Post-Project): 1.2 - 1.5
   Burlington Northern
  • Project Type: Design & Installation
  • Location: Spokane, WA
  • Specifications & Challenges:
    • 10,000 sqft of crawl space
    • 2 stories
  • Radon Level (Pre-Project): 4 - 7
  • Radon Level (Post-Project): 0.3 - 0.8
Burlington Northern Building

Previous Page

Return to Top